From first call to first swim

Most builders design first and price later. We settle your target investment on the first call, design to it, and hand you a fixed, itemized price before you sign anything to build. Here is every step, what it costs you and how long it takes.

Lit garden steps leading down to a glowing overflow pool at night
Layered night lighting, Winter Park

Three phases

You can stop after any of them. Nothing in phase one costs you anything.

Find the fit

Your survey, a short intro call, a video design consultation and a site visit. You leave with a written Site Assessment and a recommended design package.

Free. About 1 to 2 weeks.

Design it

A laser scan of your property, a discovery session, 3D renders, a fly-through and VR, revisions, then your Design Book with a fixed price.

Design fee, credited when we build. About 2 to 6 weeks.

Build it

Sealed engineering, permits and construction, run by a dedicated project manager who sends you an update every week.

Milestone payments. 10 weeks to several months.

Phase one: find the fit

  1. Send your survey

    Upload your property survey with a few lines about the project. It is usually in your closing documents or available from your title company. If you have HOA guidelines, inspiration photos or a target investment in mind, send those too.

  2. A 15-minute intro call

    We hear what you are picturing and settle the most important number, your target investment. If we are not the right builder for the project, we say so on this call.

  3. A video design consultation

    About 30 minutes with your survey and an aerial of your lot on screen. We show you what the lot allows and real projects we have built at your investment level.

  4. A site visit and your Site Assessment

    About an hour on your property looking at grade, access for equipment, drainage, soil and water table, sun, the view from inside the house and where the equipment pad belongs. Within 2 business days you get it in writing: your buildable area, what on the site affects cost, where your wish list lands, and the design package we recommend.

Phase two: design it

  1. Start your design

    Sign the design agreement and we laser scan the property to build an accurate 3D model of your yard. Your fee depends on your target investment, and it is credited toward construction. See design fees.

  2. Discovery session

    An in-person session at our Sanford design studio about how you want to live outside: entertaining, quiet evenings, kids, privacy, lighting and the finishes you are drawn to.

  3. See it, then refine it

    Renders, a fly-through and a VR walkthrough, day and night. Every change is priced as we go, so you always know where you stand against your target.

  4. Your Design Book and fixed price

    The approved design, every selection and allowance, and an itemized construction price that holds for 60 days. Compare it line by line with anyone you like.

Phase three: build it

Once you sign the construction agreement you meet your project manager, who is your single point of contact until the pool is handed over. The work runs in this order, and each payment is tied to a stage that is actually finished.

  1. Engineering and permits

    Sealed, third-party structural engineering and every permit your lot needs. Around St. Augustine that can be the city, St. Johns or Flagler County, historic review in the city's districts, and the Florida Department of Environmental Protection for anything seaward of the Coastal Construction Control Line.

  2. Layout and excavation

    We stake the pool on the ground, walk it with you, then dig to the engineered depth.

  3. Steel and plumbing

    Reinforcing steel tied to the engineered schedule, and plumbing set and pressure-tested.

  4. Gunite shell

    The shell, spa, steps and benches are sprayed and hand-shaped, then cured.

  5. Tile, coping, deck and finish

    Waterline tile, coping and the deck go in, then the interior finish.

  6. Equipment, start-up and Pool School

    Pumps, heating, automation and sanitization are installed, the pool is filled and balanced, and we teach you how to run it.

Every Southern Pool Designs gunite shell carries a lifetime structural warranty, and the same company that designed it answers for it.

Raised pool wall wrapped in iridescent glass tile with wide travertine steps, lit at night
Raised wall in glass tile with travertine steps, Apopka

Questions about the process

What does it cost to get started?

Nothing. The intro call, the video consultation, the site visit and your written Site Assessment are free, and the Site Assessment is yours to keep whether or not you design with us. You pay a design fee only when you choose to start a design, and it is credited toward construction when we build it.

Why do you ask for my survey first?

Your survey shows property lines, easements and setbacks, which decide where a pool can go and how big it can be. Near the water it also shows elevations and, on oceanfront lots, where the state's coastal line falls. Reading it before we call means the first conversation is about what you can actually build.

Will my price change after I sign?

Not unless you change the project. Your Design Book carries an itemized construction price that holds for 60 days, and that is the price in your construction agreement. If a change you ask for affects the structure after signing, it is priced as a change order before any work happens.

How long does the whole thing take?

Most of our pools take 16 to 28 weeks from the first design meeting to the first swim. Oceanfront lots that need the state's coastal permit take longer, because that review runs for months. We start it as early as the design allows.

Do I have to come to your office?

No. The intro call and design consultation happen by phone and video, and we come to your property for the site visit and throughout construction. The design discovery session is in person at our Sanford studio, and most clients enjoy seeing the finish samples there.

Step one is your survey

Tell us about the property and what you are picturing. A designer will call you to talk it through and set up a design consultation. The first conversation, the site visit and your written Site Assessment are free.

  1. A short intro call about the lot, your goals and your target investment.
  2. A design consultation where we pull up your lot and show real work at your investment level.
  3. A site visit and a written Site Assessment within 2 business days. It is yours to keep.