Coastal and historic pools in St. Augustine

Two kinds of review make St. Augustine different from almost anywhere else to build a pool: the state's coastal permit on the beaches, and the Historic Architectural Review Board in the old city. We plan for both from the first sketch, so neither becomes a surprise in month three.

Raised pool wall wrapped in iridescent glass tile with wide travertine steps, lit at night
Raised wall in glass tile with travertine steps, Apopka

On the beach: the state's coastal permit

On Anastasia Island, Vilano Beach, Crescent Beach and the Flagler County oceanfront, a pool seaward of the Coastal Construction Control Line needs a Florida Department of Environmental Protection permit as well as the city or county permit. The state's general permit for a pool at a single-family home sets these limits:

RuleWhat it means for your pool
Stay behind the 30-year erosion projectionThe state's forecast of where the shoreline will be limits how close to the dune you can build
Pool floor within 2 feet of today's grade, or the whole pool above itExpect walls that rise above the yard, which is why so many beach pools sit up high
Dug sand never leaves the lotIt is spread on the ocean side of the line, so the deck and planting are designed around it
No more than 700 cubic yards of fill, sloped rather than walledRaised decks finish in planted banks instead of retaining walls
A two-year permit that cannot be extendedWe line up the build before the permit is issued so the clock does not run out

These are the general permit's terms for a single-family pool. If a lot cannot meet them, the project goes through a slower individual permit, and we tell you that at the Site Assessment.

The sequence

  1. Survey and soils

    A current signed and sealed survey showing the control line, and a geotechnical report that decides whether the shell needs pilings. Both start the week you sign.

  2. Design locked

    Every structural choice is made before submission, because a change afterward restarts the review.

  3. State and local review

    The state reviews in rounds, and each response restarts its clock. Plan for months. On our 2026 Ponce Inlet oceanfront project it took about eleven months from contract to state permit.

  4. Pre-construction meeting

    The contractor, the owner or their representative and the state field inspector meet on site before anyone digs.

Lighting for nesting season

St. Johns County's land development code regulates new and existing beachfront lighting to protect sea turtles, and the nesting season runs May 1 to October 31. We set pool lights so they aim back toward the house, specify low, shielded and amber-capable fixtures, and program the automation for the season.

In the old city: historic review

The City of St. Augustine's Planning and Building Department at 75 King Street issues pool permits inside city limits. In the city's historic preservation zoning districts, alterations to buildings and sites require approval from the Historic Architectural Review Board, which meets on the third Thursday of each month. Some decisions are made by preservation staff, and those can be appealed to the board within 30 days.

  • Check early. We ask preservation staff which review applies before the design is final, not after.
  • Design for the place. Courtyard pools, plunge pools and spas that suit the architecture, with materials and lighting that respect the street.
  • Plan the calendar. A monthly board means the meeting date belongs in the schedule from the start.
  • Plan the access. Narrow streets and tight lots decide what equipment can reach the yard.

Our guide to building a pool in a St. Augustine historic district goes further.

On the river and the marsh

Lots on the Matanzas River, the Intracoastal and the marshes usually skip the state coastal permit but bring seawalls, flood zones, soft soil and setbacks from the water. We read the survey for all of them before we draw, so the pool is designed where it can actually be permitted.

Coastal and historic permit questions

What is the Coastal Construction Control Line?

A line the state sets along sandy beaches to mark the part of the beach and dune system that takes the brunt of a major storm. Building seaward of it is allowed, but pools, decks and fill there need a permit from the Florida Department of Environmental Protection on top of the local permit. Your surveyor can show it on your survey.

Does every pool in the historic district go to the review board?

Not every one. In the City of St. Augustine's historic preservation zoning districts, alterations to buildings and sites require Historic Architectural Review Board approval, and some determinations are made by city staff, which can be appealed to the board within 30 days. We confirm with preservation staff which path applies to your property before design is final.

Can I change my design after the state permit is submitted?

You can, but the permit then has to be revised and reviewed again, which can add months. We make every structural decision with you before submitting.

What lighting is allowed near the beach?

St. Johns County's land development code regulates beachfront lighting to protect nesting sea turtles, and the season runs May 1 to October 31. Expect shielded, low fixtures aimed away from the beach, and amber-capable lights on an automated schedule.

Planning a coastal or historic project?

Tell us about the property and what you are picturing. A designer will call you to talk it through and set up a design consultation. The first conversation, the site visit and your written Site Assessment are free.

  1. A short intro call about the lot, your goals and your target investment.
  2. A design consultation where we pull up your lot and show real work at your investment level.
  3. A site visit and a written Site Assessment within 2 business days. It is yours to keep.